Seward Montessori School, Minneapolis, MN
One-single story addition demolition that was positioned between two three story buildings. Internal shoring and bracing was required for the building separation cutting.
One-single story addition demolition that was positioned between two three story buildings. Internal shoring and bracing was required for the building separation cutting.
© All Rights Reserved, 2024 | Developed by ICBits